Basic Information
Certification
CE, FDA, ISO13485
Sterilization
Ethylene Oxide Sterilization
Disinfection
Without Disinfection
Color
Natural White/Bleached White
Product Description
| Name |
Triangular Bandage |
| Packing |
Simple packing |
Material |
Non woven/Cotton |
| Size |
96x96x136cm / 100x100x140cm / 102x102x142cm |
MOQ |
1000 |
| OEM |
Available |
Certification |
CE, ISO13485 |
| Lead Time |
Within 15 days after design confirmation |
| Samples |
Free samples provided by freight collect |
Professional Manufacturer
An innovative enterprise integrating R&D, design, and production. Holds 15 patents and is recognized as a high-tech enterprise. Certified with ISO 13485, EU CE, and US FDA. Specializing in medical bandages, dressings, and emergency care products. We offer high-quality products at competitive pricing.
Why Choose Us?
✓Professional Experience: Over 10 years of manufacturing excellence.
✓Excellent Service: Quick response times and on-time delivery.
✓High Quality: Strong technical team and strict quality control system.
✓Competitive Price: Best value for high-standard quality.
✓Low MOQ: Flexible ordering to meet your business needs.
Exhibition & Certificates
Factory Show
Frequently Asked Questions
What are your main products?
Our main products include Cotton Crepe Bandages, Conforming Bandages, Cohesive Bandages, Medical Tapes, First Aid Kits, and Adhesive Tapes.
Do you have EU representatives?
Yes, we have an EU representative in Spain, and our CE and ISO certificates are verified by TUV.
How is your quality control process?
We conduct three separate inspections from raw materials to finished products, along with comprehensive order tracking services.
What information is needed for a quotation?
Please provide product sizes and colors, packaging requirements, order quantity, and preferred price terms (FOB, CIF, EXW).
What is your MOQ?
For neutral packaging, the MOQ is 1 carton per color. For OEM packaging, custom printing is available for orders exceeding 50 cartons.
What is the production lead time?
Orders for semi-finished stock items are fulfilled within 7 days. If raw materials are in stock, production typically takes 2 weeks.